1 day to Submission.This happened on 4th February(Wednesday). Got up early, to get to school early and do up the model. We were tired of course, but there is only one day left before submission. Continuing from where we left off, we did up the banners for the model. I cut it out, and pasted it down, while Ivan ironed on the printing and putting strings on it.

The front area had also been ironed on with the necessary images and cut out (entrance).

Everybody was busy doing their work, but no matter what, everybody had to stop their work and gather for a feedback session. The director for school of design was there to discuss with us about the matters and problems that we are facing during this course. We all did opened up after a while being quiet. I guess that the important part was about the buying of materials that left all of us broke and the staying overnight issue.

Got straight away back to work after the feedback session.

After a while, I went for GEMs class. Today's class was about revision. Our test is coming soon, so it is good to start revising. My gal was there in class with me, but all I was doing was multi tasking between 3D rendering and typing down the notes. I was so busy that even though my gal was next to me, I hardly glance at her.

Back to the studio, the model was being pieced up bit by bit.


The most revealing part of our model was done next. Before this, all my classmates as well as my lecturer walking past commenting that our model was not up to standard. Only after covering the whole cloth over the model did the model took shape and revealed our finishing.

Placed the banner up and it looks almost done.

We stayed to continue doing the model.
Comment
Aidie blogged @ 9:11 AM